Search
 
Narrow Medium Full-Screen    Small Medium Large
Wagner-Meinert, Inc.  -  "Our reputation is our future."
Projects

Turkey Chiller Plant Expansion

Ammonia Refrigeration System with 700 HP Compressors, Condenser, Accumulator, Redwater Chillers, Evaporators, Purger, and piping Installation and Upgrades, Contherm Scraped Surface Heat Exchangers (2) and Process piping.

Ice Cream Plant Expansion

Ammonia Refrigeration System from 2200 tons to 3500 tons with 1500 HP Compressors, Condensers, -40°F Recirculation Package, Intercooler, -30°F Accumulator, Glycol Chiller, Evaporators, Controls, piping, and plant upgrades.

   

Warehouse Cooler Installation

Ammonia and Glycol Brine Refrigeration System for 10,300 ft² cooler in Regional Distribution Center, including New Central System, computer controls, glycol brine chiller, evaporators, and safety equipment.

Dairy Cooler Installation

Ammonia Refrigeration System for a 10,500 ft² cooler expansion using Niagara No-Frost Evaporators, 250 HP Screw Compressor, Liquid Recirculation Package, and all interconnecting refrigeration and glycol piping.

   

Ammonia Compressor Room

Modified existing system to simplify function and optimize efficiency, Added a new Compressor Room, Compressors, Condensers, Receiver, Recirculation Package, and new Frozen Distribution Center with Blast Freezer. Modified and renovated the existing process plant refrigeration,and installed new Central Ice Flaker system.

Ice Cream Plant Expansion

Designed and installed Ammonia Refrigeration System Expansion in the largest Ice Cream plant in the world. The expansion included a complete new 900 Ton Compressor room for new Storage Freezer, Dessicant technology for 0°F loading dock, and production line expansion of two Spiral Freezers and conveyors. Modifications were made to the existing ammonia distribution piping and control valves. Installed complete HVAC and Plumbing for expanded shipping office and locker rooms/cafeteria.

   

 Automotive Molding Plant

Designed and installed Quench Management Cooling System for continuous heat treating operations with multiple Process Cooling systems for continuous casting operations. The system utilizes a central bulk Nitrogen system and hydraulic piping associated with continuous casting operations. HVAC systems for multiple use points throughout the facility. Performed modifications to Chilled Water process system and central Compressed Air system for final product processing.

 Pizza Plant Remodel

Installation of two new 100 ton Spiral Freezers with enclosures, Processing Conveyors, Storage Freezer Expansion and re-racking to maximize space utilization. Upgraded Central Compressor room replacing outdated equipment with 1-500 High Stage and 1-150 HP Booster Screw Compressors and a new 350 ton Liquid Recirculation Package. Installed electrical system upgrade to automate operation of new equipment.

Print